At 00:00 on Friday, which is the end of Thursday night.
0 0 * * 5
Open in Crontab Generator
Weekly jobs that must finish before the last working day of the week.
| Field | Value | Matches |
|---|---|---|
| Minute | 0 | 0 |
| Hour | 0 | 0 |
| Day of month | * | every value |
| Month | * | every value |
| Day of week | 5 | Friday |
0 0 * * 5 /path/to/job
Computed when this page loaded (2026-11-11 02:24 UTC), assuming the scheduler runs in UTC.
| # | UTC | Your local time |
|---|---|---|
| 1 | Fri 2026-11-13 00:00 | |
| 2 | Fri 2026-11-20 00:00 | |
| 3 | Fri 2026-11-27 00:00 | |
| 4 | Fri 2026-12-04 00:00 | |
| 5 | Fri 2026-12-11 00:00 | |
| 6 | Fri 2026-12-18 00:00 | |
| 7 | Fri 2026-12-25 00:00 | |
| 8 | Fri 2027-01-01 00:00 | |
| 9 | Fri 2027-01-08 00:00 | |
| 10 | Fri 2027-01-15 00:00 |
Kubernetes uses the same five fields. Set spec.timeZone (stable since Kubernetes 1.27), otherwise the schedule follows the time zone of kube-controller-manager.
apiVersion: batch/v1
kind: CronJob
metadata:
name: every-friday-at-midnight
spec:
schedule: "0 0 * * 5"
timeZone: "Etc/UTC"
concurrencyPolicy: Forbid
startingDeadlineSeconds: 300
jobTemplate:
spec:
template:
spec:
restartPolicy: OnFailure
containers:
- name: job
image: debian:bookworm-slim
command: ["/bin/sh", "-c", "/app/run-job.sh"]
Workflow schedules use five-field cron in UTC and run only from the default branch. Runs at minute 0 are the most likely to be delayed or dropped when GitHub is busy; an odd minute such as 7 or 23 starts more reliably.
on:
schedule:
- cron: '0 0 * * 5' # UTC
jobs:
run:
runs-on: ubuntu-latest
steps:
- uses: actions/checkout@v4
- run: ./run-job.sh
The equivalent OnCalendar= value is Fri *-*-* 00:00:00.
Check it with systemd-analyze calendar 'Fri *-*-* 00:00:00', which prints the next elapse time. Persistent=true runs a missed job after downtime, which classic cron never does.
[Unit]
Description=Every Friday at midnight
[Timer]
OnCalendar=Fri *-*-* 00:00:00
Persistent=true
[Install]
WantedBy=timers.target
EventBridge rules take six fields (minute, hour, day-of-month, month, day-of-week, year) in UTC; EventBridge Scheduler can use a time zone. One of day-of-month and day-of-week must be ?, and day-of-week runs 1-7 from Sunday, so names are used here.
cron(0 0 ? * FRI *)
Quartz adds a leading seconds field and needs ? in either day field; days of the week are 1 (SUN) to 7 (SAT).
0 0 0 ? * FRI
Spring's @Scheduled(cron = ...) also uses six fields, but numbers days of the week 0-7 with Sunday as 0 or 7, like Unix cron; the names shown above work in both.
0 0 * * 10 0 * * 6,00 0 * * 60 17 * * 50 0 * * 1-50 3 * * 0