At 23:59 every day, one minute before midnight.
59 23 * * *
Open in Crontab Generator
Closing out the current day: snapshotting counters, rotating a log so it contains exactly one day.
| Field | Value | Matches |
|---|---|---|
| Minute | 59 | 59 |
| Hour | 23 | 23 |
| Day of month | * | every value |
| Month | * | every value |
| Day of week | * | every value |
59 23 * * * /path/to/job
Computed when this page loaded (2026-11-11 02:24 UTC), assuming the scheduler runs in UTC.
| # | UTC | Your local time |
|---|---|---|
| 1 | Wed 2026-11-11 23:59 | |
| 2 | Thu 2026-11-12 23:59 | |
| 3 | Fri 2026-11-13 23:59 | |
| 4 | Sat 2026-11-14 23:59 | |
| 5 | Sun 2026-11-15 23:59 | |
| 6 | Mon 2026-11-16 23:59 | |
| 7 | Tue 2026-11-17 23:59 | |
| 8 | Wed 2026-11-18 23:59 | |
| 9 | Thu 2026-11-19 23:59 | |
| 10 | Fri 2026-11-20 23:59 |
Kubernetes uses the same five fields. Set spec.timeZone (stable since Kubernetes 1.27), otherwise the schedule follows the time zone of kube-controller-manager.
apiVersion: batch/v1
kind: CronJob
metadata:
name: every-day-at-11-59pm
spec:
schedule: "59 23 * * *"
timeZone: "Etc/UTC"
concurrencyPolicy: Forbid
startingDeadlineSeconds: 300
jobTemplate:
spec:
template:
spec:
restartPolicy: OnFailure
containers:
- name: job
image: debian:bookworm-slim
command: ["/bin/sh", "-c", "/app/run-job.sh"]
Workflow schedules use five-field cron in UTC and run only from the default branch.
on:
schedule:
- cron: '59 23 * * *' # UTC
jobs:
run:
runs-on: ubuntu-latest
steps:
- uses: actions/checkout@v4
- run: ./run-job.sh
The equivalent OnCalendar= value is *-*-* 23:59:00.
Check it with systemd-analyze calendar '*-*-* 23:59:00', which prints the next elapse time. Persistent=true runs a missed job after downtime, which classic cron never does.
[Unit]
Description=Every day at 11:59pm
[Timer]
OnCalendar=*-*-* 23:59:00
Persistent=true
[Install]
WantedBy=timers.target
EventBridge rules take six fields (minute, hour, day-of-month, month, day-of-week, year) in UTC; EventBridge Scheduler can use a time zone. One of day-of-month and day-of-week must be ?, and day-of-week runs 1-7 from Sunday, so names are used here.
cron(59 23 * * ? *)
Quartz adds a leading seconds field and needs ? in either day field; days of the week are 1 (SUN) to 7 (SAT).
0 59 23 * * ?
Spring's @Scheduled(cron = ...) also uses six fields, but numbers days of the week 0-7 with Sunday as 0 or 7, like Unix cron; the names shown above work in both.
0 18 * * *0 0,12 * * *0 17 * * *0 9,17 * * *0 9 * * *0 8 * * *